The fence separating the Native Garden from the Demonstration Turf was stained.
The outside bathroom door, the storage closet door and the carpentry shop door were
painted again.
Raked up the dead turf to prepare the soil for new turf to be installed in the next few
weeks.
Installed a wooden edge to the paver pad for the double Adirondack chair and then
added pavers.
The “Fantasy Island” area needed replacement of two sprinkler heads.
There are no photos of this work project available at this time.