Year:
Month:
Day:
Activity:
The gazebo was torn down. Soil was moved to this
area and that section of the parking lot was regraded.
Removed the container from the Contemplation Garden. Removed
vegetative debris between the driveway and the Lewis Greenhouse.
Transferred stacked wood next to fence at the back of the picnic area
to the back corner outside of the Master Gardener greenhouse.
Removed nails from salvaged 2 x 6's. These will be used
to support the shelter the carpenters built along the picnic area fence.
The soil and mulch around the new sign on the corner of Bradley Drive
was roto-tilled. The posts in the parking lot were painted.
Started work in the new Shade Garden (formerly the bog garden)
to create runoff water channels to direct the water to the sump pump area.
|